1fotoart In 2001 various Resinex buoys have been installed in different Mediterranean ports.
In the course of the current Spring three important ports in the Mediterranean Sea have opted for Resinex.
Seven RPL 20 buoys plus 5 FP 3500 have320foto20art_203 been installed together with a single RPL 20 buoy with rubber fender. Resinex has been chosen thanks to the extraordinary quality mix composed of plastic and steeel structures along with the usage of first class power supply and signalling system: Pharos Marine lanterns, Solarex solar panels and Delco batteries. Therefore the above ports are safer with Resinex signalling system.220foto20art_203